Africa Coffee Park
Quality & Compliance Department
← Back to ERP Hub
CEO: Nelson Tugume  |  Quality Assurance Overseer: Kubariho Venture (Project Manager) — kubariho@africacoffeepark.com
QC Check Register
Check IDDateTypeProduct/ZoneBatch/Run RefInspectorScore %ResultStatusCorrective ActionAttachmentsActions
QC Checklist Templates
Template NameTypeCheck PointsLast UsedActions
QC Calendar
Cupping Sessions
Session#DateBatch/LotCoffee TypeOriginCupperSamplesAvg SCAGradeStatusAttachmentsActions
SCA Score Comparison
Session#DateBatchTypeFragFlavAfterAcidBodyBalUnifCleanSweetOverallDefectsTotal SCAGrade
Grade Distribution Analysis
Open Non-Conformance Reports
NCR#DateArea/DeptCategoryDescriptionSeverityAssigned ToTarget CloseDays OpenStatusAttachmentsActions
Closed NCRs
NCR#DateArea/DeptCategoryDescriptionSeverityCorrective ActionClose DateVerified ByEffectivenessActions
NCR Trend Analysis
Green Bean Grading Records
Grading#DateGRN RefSupplierTypeWeight (kg)Moisture %Defects/300gScreen SizeColourGradeGraded ByAttachmentsActions
Grade Summary by Supplier
Supplier Quality Trend
Pre-export Inspection Checklists
Check#DateConsignment RefDestinationInspectorItems CheckedResultUCDA Permit#StatusAttachmentsActions
Inspection Register
Check#DateConsignmentDestinationInspectorResultUCDA Permit#Status
Phytosanitary Certificates
Cert#Issuing AuthorityIssue DateExpiryConsignment RefStatusActions
Certificates & Licences
Cert IDCertificate NameTypeIssuing BodyIssue DateExpiry DateStatusDays to ExpiryContactRenewal Lead (days)AttachmentsActions
Compliance Calendar
Regulatory Requirements Register
RegulationAuthorityRequirementCompliance StatusLast ReviewNext ReviewActions
Preventive Maintenance Schedule
Maint#Asset IDAsset NameTaskFrequencyLast DoneNext DueAssigned ToStatusEst. DurationAttachmentsActions
Corrective Work Orders
WO#Date RaisedAssetZoneDescriptionPriorityAssigned TechnicianStatusDate ClosedAttachmentsActions
Calibration Register
InstrumentSerial#LocationStandard UsedLast CalibratedIntervalNext DueResultCalibrated ByCert#AttachmentsActions
Quick Reports
📋 QC Summary Report
Monthly pass/fail by product/process
☕ Cupping Lab Report
SCA scores and grades
⚠ NCR Status Report
Open items by severity
🎉 Certificate Status
Valid / expiring / expired
🔧 Maintenance Report
Upcoming and overdue tasks
🌿 Green Bean Grading
Grade results by supplier
🛴 Export Inspection
Compliance by consignment
🏢 Supplier Quality
Supplier grade performance
Quality Analytics Charts
Generate Custom Report
How to Use — Quality & Compliance
Step-by-step guidance for QC Inspectors, Lab Technicians, and Compliance Officers
📋 QC Checklists

Use the QC Checklists tab to log all quality checks performed on incoming raw materials, in-process batches, and finished goods.

Tip: Always assign a batch ID when logging a QC check. This links the result back to a specific production run for traceability.
  1. Click + Add QC Check to open the entry form.
  2. Select the check type: Product QC, Process QC, Incoming QC, or Environmental.
  3. Enter the batch/product reference, date, inspector name, and result (Pass / Fail / Conditional).
  4. Attach any lab notes or deviations in the remarks field.
  5. Failed checks automatically raise an alert — proceed to the NCR tab to log the non-conformance report.
Cupping Lab

The Cupping Lab tab records sensory evaluation scores for roasted coffee samples prior to export approval.

Tip: SCA specialty grade requires a cupping score of 80+. Any batch below 75 must be flagged for re-processing before export.
  1. Select the batch to be cupped from the dropdown — batches must have a completed roast record.
  2. Enter scores for: Fragrance, Aroma, Flavour, Aftertaste, Acidity, Body, Balance, Overall.
  3. The system calculates the total SCA score automatically.
  4. Add cupper names and session date, then submit the form.
  5. Scores feed directly into the Export Inspection panel for export readiness assessment.
Non-Conformance Reports (NCR)

The NCR tab manages all non-conformance events — quality failures, contamination incidents, or regulatory deviations.

Tip: Every NCR must have a corrective action assigned and a target close date. Overdue NCRs appear in the Overview KPIs in red.
  1. Click + Raise NCR and link to the originating QC check if applicable.
  2. Describe the non-conformance, severity (Minor / Major / Critical), and affected quantity.
  3. Assign a responsible person for the corrective action and set a target date.
  4. Update status as the corrective action progresses: Open → In Progress → Closed.
  5. Critical NCRs must be reported to Kubariho Venture (Project Manager) within 24 hours.
🌿 Green Bean Grading & Export Inspection

Use Green Bean Grading to record UCDA-standard defect counts and moisture content for each lot. The Export Inspection tab consolidates all pre-shipment checks for UCDA certification.

Tip: Uganda's UCDA standard requires green bean moisture content between 12–13%. Lots outside this range cannot be exported.
  1. In Green Bean Grading, enter lot ID, origin, weight, moisture reading, and defect counts per 350g sample.
  2. The system computes Grade 1 / Grade 2 / Grade 3 classification automatically.
  3. In Export Inspection, select a lot and confirm cupping score, grade classification, and packaging compliance.
  4. Generate the pre-shipment inspection certificate from the Export Inspection panel for UCDA submission.
🎉 Certifications & Reports

The Certifications tab tracks the status of all active quality certifications (UTZ, Rainforest Alliance, Organic, Halal, etc.) and their renewal schedules.

Tip: Set renewal reminders at least 90 days before expiry — audit preparation takes time.
  1. Add each certification with its body, scope, certificate number, issue date, and expiry date.
  2. Attach the certificate document reference or URL.
  3. The Overview panel shows a certification expiry countdown for the next 90 days.
  4. Use the Reports tab to generate compliance summaries for monthly management reviews or audit submissions.